LAHomework Sign in
Glendale, CA 91207 · Geneva St

1122 Geneva St

Built 1925 · 1,591 sq ft
LOT 6,861 SQ FT · 2 STRUCTURES · APN 5647-023-011Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
1,591 sqft
Lot size
6,861 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5647-023-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2008
Expected 2028 to 2038From the 2008 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 87 homes on Geneva St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2016
    permit on fileBathrooms: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Convert (E) Bath And Closet Inot 2 Bathrooms. (No Changes To Existin Square Footage, Nor Changes To Exterior).
  • 2008
    permit on fileRoof: Residential Reroof As Follows:- - - Estimated Cost Of Re-Roof:4000 - - This Is A Change Of Roofing Material (Y/N):Bo - Proposed Roofing Material:Tile - Squares (100 Sf) Being Installed:5 - Tear Off Existing (Y/N):Yes - Existing Layers Of Roofing:1 - New Sheathing Being Installed (Y/N):No - High Fire
  • 2002
    permit on fileRoof: Material: Built Up Roof-Torch Down Class A - No. Of Squares: 12 Sqs. - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: Three - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    Roof replacementExpected 2028 to 2038