LAHomework Sign in
Los Angeles, CA 90293 · Culver Blvd

112 Culver Blvd

Built 2003 · 3,628 sq ft
LOT 2,162 SQ FT · 1 STRUCTURE · APN 4116-032-002Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2003
Living area
3,628 sqft
Lot size
2,162 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Duplex (2 units)
Parcel (APN)
4116-032-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2023 to 2033From build year 2003
20262035
HVACWorth a look now
Usually done by 2023From build year 2003
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 10 homes on Culver Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: (Eplan) Methane Zone. Pv For Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 10 Modules With 10 Microinverters, 1 Energy Storage System, 2 Panels, And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 4.30Kw Dc/3.66Kw Ac.
  • 2024
    permit on file, unconfirmedRoom addition: Major Interior Remodel And Addtition To (E) Duplex W/ (E) Basement
  • 2024
    permit on fileElectrical: 200Amp Temp Power Pole, 20Amp Circuit, 50Amp Circuit

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2023
  • Now
    Roof replacementExpected 2023 to 2033