LAHomework Sign in
Los Angeles, CA 90272 · Monument St

1116 Monument St

Built 1948 · 6,355 sq ft
LOT 6,470 SQ FT · 2 STRUCTURES · APN 4423-002-004Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
6,355 sqft
Lot size
6,470 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
9
Home type
Single-family
Parcel (APN)
4423-002-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 92 homes on Monument St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPool: ***2025 Eligible Wildfire Project Per Executive Order No. 1***(N) Swimming Pool And Spa Per Standard Plan #268.
  • 2026
    permit on file, unconfirmedElectrical: Installing (1) 28Kw Generac Emergency Standby Generator. Installing (1) 200A Generac Automatic Transfer Switch.
  • 2026
    permit on file, unconfirmedSolar: (Eplan) Pv Installation Of Roof Mounted Solar Panels And Installation Of Energystorage System. Pv System Includes 44 Modules, (3) Energy Storage System, And 1Inverter Connected To Existing Mainservice Panel. System Size Is 20.24 Kw (Dc)/8.82 Kw (Cec-Ac)
  • 2026
    permit on file, unconfirmedPlumbing: Installing (1) 28Kw Generac Emergency Standby Generator Fueled By Low Pressure Gas Outlet.
  • 2025
    permit on fileElectrical: 200Amp Temporary Power Pole
  • 2021
    permit on file, unconfirmedPool: New 14' X 26' Swimming Pool And 6' X 6' Spa Within Per Standard Plan #268 And Engineer Detail
  • 2021
    permit on file, unconfirmedElectrical: 100 Amp Temp Power Pole For A Residential
  • 2019
    permit on fileGeneral remodel: 13 Windows Change-Out (Same Size & Type) For Residential Buildings. D · RENEWAL BY ANDERSON OF LOS ANGELES
  • 2019
    permit on file, unconfirmedGeneral remodel: Add Sill Plate Anchors Bolts And Cripple Wall Plywood Per L.A. City St · WHITECASTLE CONST
  • 2016
    permit on file, unconfirmedBathrooms: Bathroom Remodel For Residential Buildings (No Structural Changes). · ONE WEEK BATH INC
  • 2016
    permit on fileGeneral remodel: Complete Work Done Under Previously Expired Permit #88Wla77246. 95% Co · ONE WEEK BATH INC

Manage this home to schedule a service or to update the timeline.