LAHomework Sign in
Glendale, CA 91207 · N Isabel St

1109 N Isabel St

Built 1928 · 1,978 sq ft
LOT 6,701 SQ FT · 3 STRUCTURES · APN 5647-016-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,978 sqft
Lot size
6,701 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5647-016-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 86 homes on N Isabel St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: Relocate 200 Amp Main Service.
  • 2023
    permit on fileSolar: Roofmounted Pv System Install With 7.2 Kw Dc System Size
  • 2023
    permit on fileRoof: 17 B.Sq.Ft. Of Existing Spanish Tile Roof (Double Layer) And Set Tile Aside For Reinstallation. Replace Up To 100 Sq.Ft Of Damaged Plywood Or Shiplap As Needed To Pass City Inspection. Replacing Any Fascia Boards Or Rafters Is Not Included In This Job. Install A Double Layer Of Synthetic Underlaymen
  • 2011
    permit on filePlumbing: 1-Repair Drain Line.
  • 2004
    permit on filePlumbing: Installing A Lawn Sprinkler System, Drain, And Backflow Device.
  • 2004
    permit on fileElectrical: Installing One Branch Circuit For Landscape Lighting. - (Max Height Of Of Landscape Lighting Not To Exceed 18" Max)

Manage this home to schedule a service or to update the timeline.