LAHomework Sign in
Los Angeles, CA 91352 · Elinda Pl

10951 Elinda Pl

Built 1955 · 1,616 sq ft
LOT 15,832 SQ FT · 2 STRUCTURES · APN 2538-013-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
1,616 sqft
Lot size
15,832 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
2538-013-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 17 homes on Elinda Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on filePlumbing: Southern Ca Gas Asked Me To Pull A Permit And Inspection For Plumbing For Submeter For Adu Before They Install A Meter.
  • 2022
    permit on fileSolar: E-Plan. 2.4 Kwdc/ 1.77Kwac Pv System. 6 Modules With Microinverters.
  • 2022
    permit on fileElectrical: [Eplan] Clouded Changes To Approved Set.Revisions Include Installation Of A 100A Panel For The Adu On The Main House, Instead Of A Double Gauge Meter Panel. Adu Subpanel Is Existing To Remain. Addition Of 1 Combiner Box For Adu.Main Panel Upgrade Shall Be Permitted Separately Via Express Permit.
  • 2022
    permit on fileElectrical: New Meter For Adu Installed On Sfd.
  • 2021
    permit on filePlumbing: Reroute Kitchen Drain And Replace 2 Bathroom Secondary Drains.

Manage this home to schedule a service or to update the timeline.