LAHomework Sign in
Los Angeles, CA 91602 · Blix St

10849 Blix St

Built 1923 · 1,431 sq ft
LOT 7,706 SQ FT · 3 STRUCTURES · APN 2421-015-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
1,431 sqft
Lot size
7,706 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
2421-015-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 173 homes on Blix St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: [Eplan] Full Power Plan Check For An 11 Unit Apartment Complex With An 800A 240 1Ph 3W Service.
  • 2025
    permit on file, unconfirmedElectrical: Eplan47 Devices - Installation Of New Fire Alarm System
  • 2025
    permit on file, unconfirmedElectrical: Low Voltage Wiring. Internet Landing Point, Coax & Cat 6 Cable Running To The Units, Intercom System, Security Cameras
  • 2025
    permit on file, unconfirmedSolar: [Eplan] New Pv System Roof Mount For Pv2: (38) Modules Of 430 W, Total: 16.34 Kwdc (38) Inverter Of 384 W, Total: 14.592 Kwac (4) Stringpanel: (1) 125A (Comb)
  • 2025
    permit on file, unconfirmedHeating & cooling: Installation Of 11 Hvac Units
  • 2024
    permit on file, unconfirmedElectrical: Ufer Ground
  • 2024
    permit on file, unconfirmedElectrical: [Eplan] Service Changed To 800 Amps 120/240V 3P 4W. Changes To Distribution Ratings, Feeder Ratings, Wiring Details Changed Throughout, Transformer Added To Supply Elevator. Changes Clouded.
  • 2024
    permit on file, unconfirmedPlumbing: New Plumbing For New Adu
  • 2024
    permit on file, unconfirmedPlumbing: Install New Plumbing System Including Potable Water, Waste, Vent, And Gas Systems. 2" Water Meter And 2" Rp Backflow Device.
  • 2023
    permit on fileElectrical: Install Temp Electrical Pole

Manage this home to schedule a service or to update the timeline.