LAHomework Sign in
Culver City, CA 90230 · Lindblade St

10829 Lindblade St

Built 1940 · 2,097 sq ft
LOT 4,759 SQ FT · 2 STRUCTURES · APN 4210-022-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
2,097 sqft
Lot size
4,759 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
4210-022-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 133 homes on Lindblade St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: 27 Sq Full Re-Roof. Remove Existing Roofing Down To The Deck. Install New Synthetic Underlayment And Comp Shingles.
  • 2025
    permit on fileSolar: E25-0628: New Pv System 6.150 Kw Dc E25-0612: Energy Storage System: (1) Tesla Powerwall 3, 11.5 Kw (Inv + Bat)
  • 2025
    permit on fileSolar: E25-0628: New Pv System 6.150 Kw Dc,11.500 Kw Ac E25-0612: Energy Storage System: (1) Tesla Powerwall 3, 11.5 Kw (Inv + Bat)
  • 2025
    permit on file, unconfirmedSolar: Permanent Removal Of 15 Existing Roof-Mounted Solar Modules
  • 2023
    permit on filePlumbing: Remodel Of (3) Bathrooms, Entry Remodel, Wet Bar Remodel, Window Replacement.
  • 2023
    permit on fileHeating & cooling: Mechanical - Does Not Include Ac
  • 2023
    permit on fileElectrical: Remodel Of (3) Bathrooms, Entry Remodel, Wet Bar Remodel, Window Replacement.

Manage this home to schedule a service or to update the timeline.