LAHomework Sign in
Los Angeles, CA 91040 · Turnbow Dr

10608 Turnbow Dr

Built 1954 · 2,092 sq ft
LOT 6,912 SQ FT · 1 STRUCTURE · APN 2547-007-001Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
2,092 sqft
Lot size
6,912 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
2547-007-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 21 homes on Turnbow Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: 5 Gang Meter Servicing 10608 Turnbow Dr , Units 1-5Total Connected Load Less Than 400Amps
  • 2023
    permit on file, unconfirmedRoom addition: Convert (E) 2-Story Duplex To (N) 4 Unit Apt & Enclose (E) 10'X13' Porch With Attach Adu [See Comments] _ Building Shall Be Fully Sprinkler Through Out With Nfpa 13 [See Comments].
  • 2023
    permit on fileHeating & cooling: Existing 4-Unit Buildings With An Attached Adu. New Ac Mini Split.
  • 2023
    permit on filePlumbing: Existing Duplex To Be Converted Into New 4-Unit Buildings With An Attached Adu.Replace And Remove Fixtures On The Existing Units + Install New Fixtures For The New Units
  • 2020
    permit on filePlumbing: New Gas Piping From The Meter Location To The Dryer.

Manage this home to schedule a service or to update the timeline.