LAHomework Sign in
Los Angeles, CA 90064 · Cheviot Dr

10573 Cheviot Dr

Built 2011 · 4,383 sq ft
LOT 6,220 SQ FT · 1 STRUCTURE · APN 4318-040-016Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2011
Living area
4,383 sqft
Lot size
6,220 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
4318-040-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2031 to 2041From build year 2011
20262035
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterWorth a look now
Expected 2021 to 2026From build year 2011
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 101 homes on Cheviot Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Change Out Package Unit.
  • 2026
    permit on fileHeating & cooling: Change Out Package Unit In The Same Location.
  • 2025
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2020
    permit on fileSolar: Pv1, New Rooftop Mounted System, System Size Is 6.58Kwac/ 7.2Kwdc. System Includes 18 Ac Modules (Spr-A400-G-Ac) A New 100A Load Center, Interconnected To An Existing 200A Msp.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2021 to 2026
  • 2031
    Roof replacementExpected 2031 to 2041