LAHomework Sign in
Glendale, CA 91201 · Rosedale Ave

1053 Rosedale Ave

Built 1926 · 964 sq ft
LOT 6,506 SQ FT · 2 STRUCTURES · APN 5623-035-007Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
964 sqft
Lot size
6,506 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5623-035-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 57 homes on Rosedale Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2002
    permit on fileBathrooms: Bath Remodel And Replace 1 Window.
  • 2002
    permit on filePlumbing: One Water, One Repipe (One Bathroom), One Building Sewer, And One Gas Sytem.
  • 2002
    permit on fileElectrical: 13 Circuits And 1 200 Amp Service.
  • 2002
    permit on fileRoof: Material: Modified Bitumen Class A (Garage Only) - No. Of Squares: 3 Sqs - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Ex
  • 2002
    permit on fileRoof: Material: Modified Bitumen Class A (House Only) - No. Of Squares: 12 Sqs - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 3 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Ex

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2022 to 2032