LAHomework Sign in
South Gate, CA 90280 · Rosewood Ave

10521 Rosewood Ave

Built 1928 · 1,416 sq ft
LOT 5,327 SQ FT · 2 STRUCTURES · APN 6220-023-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,416 sqft
Lot size
5,327 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6220-023-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 113 homes on Rosewood Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedGeneral remodel: Inspection Only For New Ps#23-9893 Scheduled For Tuesday, 03/14/2023 Inspection Hours Are Between 9-5 Pm - Call Inspector Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9549, Garages Must Be Open For Inspection, Dogs Must Be Tied Please Be Aware That, Although The Inspection Is E
  • 2019
    permit on fileSolar: New Photovoltaic System - 14 Panels 245.70 Sq Ft No Meter Upgrade
  • 2019
    permit on fileElectrical: Renew #17-3220 For H.V.A.C-Sfr Installation Of Central Heating & A/C System-(Package Unit On The Roof) ***Note: Hers Rating Must Be Provided To Inspector Before Final Can Be Issued***
  • 2018
    permit on fileElectrical: Sfr-Alt - New Front Door Installation (Closing Existing Front Door Facing South And Relocating It To Front Facing East) -Installation Of New Window At Front Of Dwelling ***Note:Pending Field Inspection, Leave Framing Open For Inspection***
  • 2017
    permit on fileElectrical: Sfr-Elect - Panel Upgrade - 200 Amp (Requires Southern California Edison Location / Meter Spot Approval) -Re-Wire Dwelling
  • 2017
    permit on fileElectrical: H.V.A.C-Sfr Installation Of Central Heating & A/C System-(Package Unit On The Roof) ***Note: Hers Rating Must Be Provided To Inspector Before Final Can Be Issued***
  • 2016
    permit on fileElectrical: Violations Correct Ps#15-7691 Garage Corrections -Light Fixture At West Side (Exterior) Of Garage -Light Fixture At North Side Of Garage -Receptacle At Northeast Corner (Exterior) Of Garage -Garage Door Opener Installation
  • 2015
    permit on fileGeneral remodel: P.S.# 15-7691 Inspection Is Between 9-1 Pm...Monday, 10/26/2015 Garages Must Be Open For Inspection, Dogs Must Be Tied Call Inspector Between 8-9 Am For A Morning Inspection Confirmation At (323)563-9549, Please Be Aware That, Although The Inspection Is Exterior Only, If The Inspector Sees Any Indic

Manage this home to schedule a service or to update the timeline.