LAHomework Sign in
Los Angeles, CA 91311

10500 Boulder Ridge Ter

Built 1967 · 3,539 sq ft
LOT 43,583 SQ FT · 1 STRUCTURE · APN 2723-009-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1967
Living area
3,539 sqft
Lot size
1.00 acres
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
2723-009-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoof: Add A Soffit Under The (E) Roof Eaves
  • 2020
    permit on fileSolar: Pv1. Install 13.68 Kw Roof Mounted Pv System And 13.5 Kwh Energy Storage System. (38) Modules With 10 Kw Rated Inverter.Fees $57.17 Due To California Senate Bill 1222 And Ab 1414
  • 2020
    permit on fileElectrical: Install 400A Split Busbar Panelboard With (1) 200A Main Breaker And (1) 100A Main Breaker
  • 2020
    permit on fileSolar: Change Of Address To Match To Utility Records.No Fee Department Errormaster Permit Work Description: Pv1. Install 13.68 Kw Roof Mounted Pv System And 13.5 Kwh Energy Storage System. (38) Modules With 10 Kw Rated Inverter.
  • 2020
    permit on fileElectrical: Change Of Address To Match To Utility Records.No Fee Department Errormaster Permit Work Description: Install 400A Split Busbar Panelboard With (1) 200A Main Breaker And (1) 100A Main Breaker

Manage this home to schedule a service or to update the timeline.