LAHomework Sign in
Torrance, CA 90502 · Gian Dr

1050 Gian Dr

Built 1977 · 2,172 sq ft
LOT 4,500 SQ FT · 1 STRUCTURE · APN 7344-031-056Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1977
Living area
2,172 sqft
Lot size
4,500 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
7344-031-056

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 54 homes on Gian Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoom addition: 526 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With 1 Bedroom, 3/4 Bath.
  • 2025
    permit on filePlumbing: 526 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With 1 Bedroom, 3/4 Bath.
  • 2025
    permit on filePlumbing: 526 Sf Garage Conversion To Accessory Dwelling Unit (Adu) With 1 Bedroom, 3/4 Bath.
  • 2025
    permit on filePlumbing: 638 Sf Accessory Dwelling Unit (Adu) With 2 Bedrooms, 2 Baths. 2.23 Kw Pv Systems And Electric Readiness Required.
  • 2025
    permit on filePlumbing: 638 Sf Accessory Dwelling Unit (Adu) With 2 Bedrooms, 2 Baths. 2.23 Kw Pv Systems And Electric Readiness Required.
  • 2025
    permit on fileHeating & cooling: Mini Split System Garage Conversion
  • 2025
    permit on fileElectrical: Garage Conversion
  • 2025
    permit on fileElectrical: New Adu, Part Of Another Building Permit, Permit Is For Electrical
  • 2025
    permit on fileHeating & cooling: Adu
  • 2025
    permit on fileSolar: 6 Module 2.4Kw System Roof Mounted

Manage this home to schedule a service or to update the timeline.