LAHomework Sign in
Compton, CA 90220 · E 149th St

1045 E 149th St

Built 2002 · 3,119 sq ft
LOT 10,134 SQ FT · 1 STRUCTURE · APN 6137-016-065Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
3,119 sqft
Lot size
10,134 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
6137-016-065

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2022 to 2032From build year 2002
20262035
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 40 homes on E 149th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: 2 5.0Kwh Ess, 1 125A Solar Load Center, 1 125A Backup Load Panel, Related To Solr240920001209
  • 2024
    permit on file, unconfirmedSolar: Residential Roof Mount Pv: 8.610Kw 21 Modules (2) Ess
  • 2024
    permit on fileSolar: Roof Mounted Residential Solar Pv 8.6Kwdc 8.0Kwac 21 Modules 21 Micro-Inverters, 1 Combiner Box, 2 5.0Kwh Ess, 1 125A Solar Load Center, 1 125A Backup Load Panel,
  • 2022
    permit on fileGeneral remodel: Remove Existing Tub, Install New Walk In Tub, Install New 20Amp Circuit For Outlet, Drywall Patch
  • 2022
    permit on fileElectrical: Remove Existing Tub, Install New Walk In Tub, Install New 20Amp Circuit For Outlet, Drywall Patch
  • 2022
    permit on filePlumbing: Remove Existing Tub, Install New Walk In Tub, Install New 20Amp Circuit For Outlet, Drywall Patch

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022
  • Now
    Roof replacementExpected 2022 to 2032