LAHomework Sign in
South Gate, CA 90280 · Stanford Ave

10432 Stanford Ave

Built 1944 · 796 sq ft
LOT 4,702 SQ FT · 2 STRUCTURES · APN 6207-018-034Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1944
Living area
796 sqft
Lot size
4,702 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6207-018-034

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 141 homes on Stanford Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2016
    permit on fileGeneral remodel: P.S.#16-7765 Inspection Is Between 9-1 Pm...Monday, 01/25/2016 Garages Must Be Open For Inspection, Dogs Must Be Tied Call Inspector Between 8-9 Am For A Morning Inspection Confirmation At (323)563-9549, Please Be Aware That, Although The Inspection Is Exterior Only, If The Inspector Sees Any Indica
  • 2016
    permit on fileGeneral remodel: Violations Correct Ps#16-7765 Dwelling Corrections -12 Window Replacements Windows Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor And 24" From Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Carbon Monoxide Detectors Re
  • 2016
    permit on fileGeneral remodel: Violations Corrections Ps#16-7765 Garage Corrections -Removal Of Wall And Ceiling Coverings
  • 2011
    permit on fileGeneral remodel: Pre-Sale Schedule For Tuesday 02-08-11 Between 9-12 Noon
  • 2010
    permit on fileGeneral remodel: Pre Sale #10-5621 Scheduled For Tuesday 05/25/2010
  • 2010
    permit on fileElectrical: Light At Side Door Service Panel -Edison Approval Required Rear Required Elect At East Side Water Service Repipe Hot And Cold Water Lines Vent At Kitchen Replaced Water Heater Reloc Kitchen Remodel Bathroom Remodel
  • 2010
    permit on fileElectrical: Pre Sale Corr #10-5621-Garage Re Roofed Det Garage Removal Of Room At Inside N/E Corner Remove Drywall Min Electrical For Det Garage Remove Exahust Fan In Garage
  • 2010
    permit on fileElectrical: Pre Sale Corr #10-5621 Remove Non Permitted Laundry From Garage And Relocate Into Dwg Remove Plumbing At Northeast Corner Exterior/Interior Of Garage

Manage this home to schedule a service or to update the timeline.