LAHomework Sign in
South Gate, CA 90280 · Annetta Ave

10419 Annetta Ave

Built 1939 · 792 sq ft
LOT 4,978 SQ FT · 3 STRUCTURES · APN 6219-017-008Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1939
Living area
792 sqft
Lot size
4,978 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6219-017-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2018
Expected 2028 to 2033From the 2018 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 235 homes on Annetta Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: Block Wall 70 Ln Ft Rear Of Property
  • 2021
    permit on fileRoof: Tear Off Re-Roof Dwelling Replace Sheathing 12 Squares Replace Fascia Boards Recycle Required, Fill Out Wrrp Form And Return To Building And Safety Along With Receipts Before Final. **Note: You Must Specify To The Recycling That Materials Come From South Gate (Your Receit Must Show That All Material
  • 2021
    permit on fileRoof: Tear Off Re-Roof Guest Room Replace Sheathing Recycle Required, Fill Out Wrrp Form And Return To Building And Safety Along With Receipts Before Final. **Note: You Must Specify To The Recycling That Materials Come From South Gate (Your Receit Must Show That All Materials Come From South Gate) ***If Y
  • 2021
    permit on fileRoof: Tear Off Re-Roof Garage New Sheathing 5 Sq Replace Fascia Boards Recycle Required, Fill Out Wrrp Form And Return To Building And Safety Along With Receipts Before Final. **Note: You Must Specify To The Recycling That Materials Come From South Gate (Your Receit Must Show That All Materials Come From
  • 2018
    permit on fileGeneral remodel: Correct Vio @ Sfr Per Ce Case#18-000118 - (11) Window Replacements Windows Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor And 24" From Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Carbon Monoxide Detectors Required B
  • 2018
    permit on fileWater heater: Correct Vio @ Sfr Per Ce Case#18-000118 - Dwelling Corrections -Removal Of Non-Permitted Laundry From Inside Dwelling And Restore To Permitted Laundry Room Attached To Garage (Inspector To Field Verify That Original Connections Still Exist In Laundry Room) -Water Heater Relocation To Rear Of Dwellin
  • 2018
    permit on fileGeneral remodel: Correct Vio @ Sleeping Room Per Ce Case#18-000118 - (8) Window Replacements At Sleeping Room
  • 2018
    permit on fileGeneral remodel: Correct Vio @ Detached Garage Per Ce Case#18-000118 - (2) Window Replacements At Detached Garage With Attached Laundry Room
  • 2018
    permit on fileGeneral remodel: Legalize 16"W By 92"L Awning For Over Existing Door & Window At Sleeping Room

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    Water heater replacementExpected 2028 to 2033