LAHomework Sign in
South Gate, CA 90280 · Stanford Ave

10401 Stanford Ave

Built 1947 · 1,126 sq ft
LOT 4,658 SQ FT · 2 STRUCTURES · APN 6207-017-016Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
1,126 sqft
Lot size
4,658 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6207-017-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2019
Expected 2039 to 2049From the 2019 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 141 homes on Stanford Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedGeneral remodel: Window Repl (2)- One Retrofit Bedroom Window 35 1-2 X 59 1-2 Adding One Window 35 1-2 X 59 1-2 Windows Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor And 24 From Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Carbon Mo
  • 2019
    permit on fileRoof: Tear Off & Re-Roof Rear Half Of Dwelling And Attached Enclosed Patio Cover - 7 Squares - New Sheathing Recycle Required, Fill Out Wrrp Form And Return To Building And Safety With Estimated Quantities Before Obtaining Permit Return A Completed Final Form Along With Receipts Before Final. **Note? You
  • 2017
    permit on fileGeneral remodel: Ps#16-8280 Inspection Is Between 9-5:30 Pm... Wednesday 06/28/2017 Call Inspector Between 8-9 Am For A Morning Or Afternoon Inspection Confirmation At (323)563-9549, ***Garages Must Be Open For Inspection And Dogs Must Be Tied Please Be Aware That, Although The Inspection Is Exterior Only, If The In
  • 2017
    permit on fileElectrical: Correct Vio @ Sfr Per Ps#17-8280 - Dwelling Corrections -Tear Off And Re-Roof Dwelling - 12 Squares -Removal Of Non-Permitted Detached Patio Cover With Storage Shed At Rear West Side Of Dwelling -Required Exterior Receptacle At West Side Of Dwelling -Required Exterior Light Fixture For Side Door At
  • 2017
    permit on fileRoof: Correct Vio @ Detached Garage Per Ps#17-8280 - Detached Garage Corrections -Tear Off And Re-Roof Detached Garage - 5 Squares -Removal Of Added Wall And Ceiling Coverings In Detached Garage -One (1) Window Installation/Replacement At Garage (West Side) -(1) Security Bar Installation At Garage Window

Manage this home to schedule a service or to update the timeline.