LAHomework Sign in
Glendale, CA 91207 · Kildonan Dr

1040 Kildonan Dr

Built 2020 · 4,005 sq ft
LOT 11,706 SQ FT · 1 STRUCTURE · APN 5649-037-005Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2020
Living area
4,005 sqft
Lot size
11,706 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
5
Home type
Single-family
Parcel (APN)
5649-037-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterComing up
Expected 2030 to 2035From build year 2020
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 27 homes on Kildonan Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileHeating & cooling: (2) Fau Up To 100,000 Btu, (2) Fan Coil Units, (2) Up To And Including 3 Hp Or 60M, 2 Connection Of Equipment To A Gas System. Separate Permit For The Air Distribution System (Ductwork, Registers, Grilles, Etc.), Part Of Combination Building Permit.
  • 2021
    permit on fileElectrical: Sr N-125A Dist Panel N-200A Lc, 2 Ess-27Kw Sub Panel
  • 2021
    permit on fileSolar: Solar Solar Roof 145 Panels 8.478Kw, 2-Ess-27 Kw N-200A Lc, N-125A Dist Panel 35.478 Kw Revision To Approved Plans; Adjusted Layout And Strings Solar Roof 8.47815 Kw, 27 Kwh Energy Storage System Revised 6/22/2021 Revision To Approved Plans Change Of Location Of Equipment
  • 2021
    permit on fileRoof: Roof-Solar Glass-See Bsolar2103652
  • 2021
    permit on fileElectrical: (1) 201-400Amp Residential
  • 2020
    permit on filePool: New Pool & Spa. 36' X 15' //
  • 2020
    permit on filePlumbing: One Sewer Connection C6050
  • 2019
    permit on fileElectrical: 1 Temporary Service
  • 2019
    permit on filePlumbing: Sewer Cap
  • 2003
    permit on fileRoof: Material: Comp Shingle House And Attached Garage Class A - No. Of Squares: 38 - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Ov

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035