LAHomework Sign in
Agua Dulce, CA 91390

10350 Pike Rd

Built 2005 · 4,042 sq ft
LOT 109,632 SQ FT · 2 STRUCTURES · APN 3212-009-046Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
4,042 sqft
Lot size
2.52 acres
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
3212-009-046

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: Installation Of A 24 Module Solar Pv System With 24 Microinverter. System Size Is 9.840 Kwp+ 2 Enphase Iq Battery 5P - 5Kwh + N) Reliance Controls + (N) 125A Enphase Iq Combiner 5C Box + (N) Ac Combiner Panel
  • 2021
    permit on filePlumbing: Replace 1500 Gallon Septic Tank With A New 1500 Gallon Traffic Rated Septic Tank.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035