LAHomework Sign in
Los Angeles, CA 90002 · Anzac Ave

10334 Anzac Ave

Built 2005 · 2,280 sq ft
LOT 3,236 SQ FT · 2 STRUCTURES · APN 6066-005-055Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
2,280 sqft
Lot size
3,236 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
2
Home type
Single-family
Parcel (APN)
6066-005-055

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 156 homes on Anzac Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: Install One 200 Amp Meter With Sub Panel & Existing Circuit
  • 2020
    permit on fileWater heater: New Gas Meter Main / Water Heater Hot Water Supply Line
  • 2018
    permit on filePlumbing: Plumbing Permit · PAREDES LEON JOSE LUIS
  • 2018
    permit on fileElectrical: Electrical Permit · PAREDES LEON JOSE LUIS
  • 2018
    permit on file, unconfirmedGeneral remodel: Altration To (E) 2 Story Single Familt Dwelling To Create An Accessory · PAREDES LEON JOSE LUIS

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035
  • 2030
    Water heater replacementExpected 2030 to 2035