LAHomework Sign in
Los Angeles, CA 90044 · W 110th St

1028 W 110th St

Built 1987 · 3,234 sq ft
LOT 8,960 SQ FT · 2 STRUCTURES · APN 6076-013-012Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1987
Living area
3,234 sqft
Lot size
8,960 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
8
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
6076-013-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 136 homes on W 110th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Electrical Service Upgrade To "400A, 120/240V, 1Ph, 3W", Overhead Service For (4) Existing Units + Existing (1) House Meter + (3) New Adu Units.
  • 2025
    permit on fileSolar: Installation For New 3 Pv Modules With Microinverters Solar System. Unit 5
  • 2025
    permit on fileSolar: Unit 6, New Pv System Installation 1.2Kw With Micro Inverters.
  • 2024
    permit on filePlumbing: 1590 Sf Duplex Adu, Each Adu Consists Of 2 Bedrooms And 2 Baths. Stc-50 And 1-Hr Fire Rated Assembly Between Adu'S. Pv System And Fire Sprinklers Are Required.
  • 2024
    permit on fileElectrical: 467 Sf Attached Garage Conversion To Adu, Includes 1 Bedroom And 1 Bath. Stc-50 And 1-Hr Fire Rated Separation Required Bedtween Adu And Multi-Residential Building.
  • 2024
    permit on fileHeating & cooling: 467 Sf Attached Garage Conversion To Adu, Includes 1 Bedroom And 1 Bath. Stc-50 And 1-Hr Fire Rated Separation Required Bedtween Adu And Multi-Residential Building.
  • 2024
    permit on fileSolar: 1590 Sf Duplex Adu, Each Adu Consists Of 2 Bedrooms And 2 Baths. Stc-50 And 1-Hr Fire Rated Assembly Between Adu'S. Pv System And Fire Sprinklers Are Required.
  • 2024
    permit on filePlumbing: 1590 Sf Duplex Adu, Each Adu Consists Of 2 Bedrooms And 2 Baths. Stc-50 And 1-Hr Fire Rated Assembly Between Adu'S. Pv System And Fire Sprinklers Are Required.
  • 2024
    permit on filePlumbing: 467 Sf Attached Garage Conversion To Adu, Includes 1 Bedroom And 1 Bath. Stc-50 And 1-Hr Fire Rated Separation Required Bedtween Adu And Multi-Residential Building.
  • 2024
    permit on fileHeating & cooling: 1590 Sf Duplex Adu, Each Adu Consists Of 2 Bedrooms And 2 Baths. Stc-50 And 1-Hr Fire Rated Assembly Between Adu'S. Pv System And Fire Sprinklers Are Required.
  • 2024
    permit on filePlumbing: 467 Sf Attached Garage Conversion To Adu, Includes 1 Bedroom And 1 Bath. Stc-50 And 1-Hr Fire Rated Separation Required Bedtween Adu And Multi-Residential Building.

Manage this home to schedule a service or to update the timeline.