LAHomework Sign in
Santa Monica, CA 90403 · 12th St

1027 12th St

Built 1930 · 3,095 sq ft
LOT 7,445 SQ FT · 3 STRUCTURES · APN 4281-018-020Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1930
Living area
3,095 sqft
Lot size
7,445 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
5
Home type
Fourplex (4 units)
Parcel (APN)
4281-018-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2018
Expected 2028 to 2033From the 2018 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 199 homes on 12th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on file, unconfirmedGeneral remodel: Voluntary Soft-Story Seismic Retrofit Of Two-Story Apartment Building Consisting Of One Special Cantilever Column With Grade Beam.
  • 2021
    permit on fileKitchen: Apt B And C: Kitchen: Remove And Replace Sink, Close Off Interior Door In The Kitchen. Bathroom: Remove And Replace Sink, Toilet, And Tub. No Structural Work. Re-Wire Each Unit; For Apt B Building: 5-Meter Main Panel Electrical Upgrade And New Subpanels For: Front House (Building Closest To 12Th Str
  • 2018
    permit on file, unconfirmedRoof: 1027 12Th St. - Complete Re-Roof And Replace Broken Electrical Outside (Plugs And Switches). Rev 2/14/18 Water And Drainage Repipe For (2) Bathrooms, Kitchen , Laundry, Water Heater, Drain Vents, Up To The Roof, Heating Unit, Double Wall With Vent, 80 Ft Of Sewer Drain Line 4". Rev 2/20/18 Replace O
  • 2018
    permit on fileGeneral remodel: 1027 12Th St - Replace Windows In Existing Openings
  • 2018
    permit on fileWater heater: 1027 12Th St - Replace Water Heater In Laundry (50 Gal) And Middle House (40 Gal), Replace 15' Of 1.5" Copper Main Line In Garage Located In Back House By Alley

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    Water heater replacementExpected 2028 to 2033