LAHomework Sign in
South Gate, CA 90280 · San Jose Ave

10211 San Jose Ave

Built 1938 · 702 sq ft
LOT 4,581 SQ FT · 2 STRUCTURES · APN 6207-011-005Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1938
Living area
702 sqft
Lot size
4,581 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6207-011-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2017
Expected 2027 to 2032From the 2017 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 75 homes on San Jose Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2017
    permit on fileGeneral remodel: Inspection Only For New Ps#2017-8331 -- Scheduled For Tuesday 08/22/2017. Inspection Hours Are Between 9-5 Pm - Call Inspector Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9549, Garages Must Be Open For Inspection, Dogs Must Be Tied Please Be Aware That, Although The Inspection
  • 2017
    permit on fileWater heater: Correct Vio @ Dwg With Attached Garage Per Ps#2017-8331 -Tear Off And Re-Roof- 10 Squares -Maintain Min Electrical In Garage To Be Verified -Water Heater Replacement
  • 2017
    permit on fileElectrical: Sfr- Detached Storage Room Add Min Electrical, Feeder From Dwg To Storage
  • 2013
    permit on fileElectrical: Conduit At Service Panel Per Ps Corr #08-4770
  • 2012
    permit on fileGeneral remodel: Pre-Sale #08-4770 Added Window At Workshop (Northside)
  • 2012
    permit on fileElectrical: Pre-Sale #08-4770 Restoration Of Accessory Room-Workshop
  • 2012
    permit on filePlumbing: Pre-Sale #08-4770 Installed Three(3) Inch A.B.S. Plastic Cleanout At Northwest Corner Of The Dwelling
  • 2011
    permit on fileGeneral remodel: Pre-Sale 08-4770 - Remove Drywall At Garage
  • 2011
    permit on filePlumbing: Ps Corr #08-4770-- Removal Of Water Softener And Hose Bibb

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2027
    Water heater replacementExpected 2027 to 2032