LAHomework Sign in
Altadena, CA 91001 · E Poppyfields Dr

1018 E Poppyfields Dr

Built 1940 · 4,112 sq ft
LOT 12,046 SQ FT · 1 STRUCTURE · APN 5844-004-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
4,112 sqft
Lot size
12,046 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
5844-004-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 98 homes on E Poppyfields Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPool: Remodel (E) 390 Sf Swimming And Add 49 Sf New Spa
  • 2023
    permit on file, unconfirmedElectrical: Elec For Whole House Remodel. Main Panel Upgrade To 400 Amp With 2-100 Amp Sub Pnales And 60 Amp Subpanel. Install 2 Electric Vehicle Chargers.
  • 2023
    permit on file, unconfirmedHeating & cooling: Installation Of Two Minisplit Heat Pump Systems And 4 Air-Handlers (Two Per Unit)
  • 2023
    permit on fileElectrical: Temp. Power Pole.
  • 2022
    permit on file, unconfirmedWater heater: Complete Replacement Of Drainage And Venting. New Pex Piping For All Fixtures. Remodel Of 2 Existing Bathrooms (One On First Floor And One On Second Floor With Relocation Of All Fixtures) Addition Of Master Bathroom With Steam Shower, Addition Of 4Th Bathroom (First Floor), New Laundry Room With Sin

Manage this home to schedule a service or to update the timeline.