LAHomework Sign in
Los Angeles, CA 90007 · W 21st St

1015 W 21st St

Built 1905 · 1,588 sq ft
LOT 6,617 SQ FT · 1 STRUCTURE · APN 5124-004-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1905
Living area
1,588 sqft
Lot size
6,617 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5124-004-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 24 homes on W 21st St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: 6-100Amp Sub Panels For 6 Adu & 84- New Branch Circuits
  • 2026
    permit on fileElectrical: 40 Devices For Low Voltage
  • 2026
    permit on fileElectrical: Fire Sprinkler Monitoring For Aduref. Transaction Id # H25-142890
  • 2026
    permit on filePlumbing: 6 Adu Complete Plumbing Work
  • 2026
    permit on fileHeating & cooling: Hvac For Adu 6 Units
  • 2026
    permit on fileHeating & cooling: Installation Of 6 Heat Pump Systems With Duct Work
  • 2025
    permit on file, unconfirmedElectrical: Temp Power Pole 200 Amp
  • 2025
    permit on fileElectrical: [Eplan] Full Plan Check For New 600A 240/120V 1Ph-3W Service, Distribution, Power, And Lighting For New Apartment Building. Plan Check For Power And Energy. Total Square Footage = 4023 Sf
  • 2025
    permit on fileElectrical: Fire Alarm Monitoring System
  • 2025
    permit on fileElectrical: Low Voltage Wiring
  • 2025
    permit on filePlumbing: New Plumbing System. Includes Potable Water System With 1" Domestic Water Meter And Drainage Waste/Vent Systems.
  • 2025
    permit on file, unconfirmedHeating & cooling: Install New Hvac Systems Including Heat Pumps, Ventilation Fans, And Ducts.
  • 2025
    permit on filePlumbing: Hose Bibb
  • 2025
    permit on fileHeating & cooling: Installation Of New Hvac System And Duct Work
  • 2021
    permit on fileGeneral remodel: "Comply With Department Order Effective Date 07/09/2021. Permit Will Expire 30 Days From Issuance Date"Window (20) Change-Out (Same Size & Type) For Residential Buildings.

Manage this home to schedule a service or to update the timeline.