LAHomework Sign in
Beverly Hills, CA 90210 · N Beverly Dr

1011 N Beverly Dr

Built 1926 · 20,570 sq ft
LOT 153,072 SQ FT · 5 STRUCTURES · APN 4348-001-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
20,570 sqft
Lot size
3.51 acres
Structures on lot
5 main home plus another structure: a garage, guest house or ADU
Bedrooms
9
Bathrooms
15
Home type
Single-family
Parcel (APN)
4348-001-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 265 homes on N Beverly Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedBathrooms: Interior Non-Sturctural Remodel Of 2-Story Sfr. Layout Change For Bathrooms On 1St And 2Nd Fllor. Add Bathroom In Basement
  • 2026
    permit on file, unconfirmedElectrical: Interior Non-Sturctural Remodel Of 2-Story Sfr. Layout Change For Bathrooms On 1St And 2Nd Fllor. Add Bathroom In Basement
  • 2026
    permit on file, unconfirmedHeating & cooling: Interior Non-Sturctural Remodel Of 2-Story Sfr. Layout Change For Bathrooms On 1St And 2Nd Fllor. Add Bathroom In Basement
  • 2026
    permit on file, unconfirmedPlumbing: Interior Non-Sturctural Remodel Of 2-Story Sfr. Layout Change For Bathrooms On 1St And 2Nd Fllor. Add Bathroom In Basement
  • 2025
    permit on file, unconfirmedElectrical: Exterior Remodel Of (E) Sfr - Restore Ballroom Loggia Glazing, Replace Balconies On 2Nd Floor To Match Historic Design, Replace Doors And Windows, Remove Balustrade Over Ballroom And Replace With Stucco
  • 2025
    permit on file, unconfirmedElectrical: Remodel Of (E) Pool House--Convert Storage To Bathroom, Guest Bathroom Remodel, Change Out Four Windows On 2Nd Floor.
  • 2025
    permit on file, unconfirmedHeating & cooling: Remodel Of (E) Pool House--Convert Storage To Bathroom, Guest Bathroom Remodel, Change Out Four Windows On 2Nd Floor.
  • 2025
    permit on file, unconfirmedPlumbing: Remodel Of (E) Pool House--Convert Storage To Bathroom, Guest Bathroom Remodel, Change Out Four Windows On 2Nd Floor.
  • 2023
    permit on file, unconfirmedElectrical: Temp Power From (1) 65 Kva Portable Generator For Event On 5.2.23

Manage this home to schedule a service or to update the timeline.