LAHomework Sign in
La Puente, CA 91746 · Sandia Ave

1008 Sandia Ave

Built 1956 · 1,700 sq ft
LOT 6,145 SQ FT · 1 STRUCTURE · APN 8465-024-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,700 sqft
Lot size
6,145 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
8465-024-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 155 homes on Sandia Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedSolar: 6.0 Kw Dc Pv, 27 Kwh Ess, (15) Solar Modules, (1) Ess Battery + Inverter, (1) Ess Battery Expansion Unit, (1) Tesla Backup Switch, (2) Ac Disconnect, (1) Ess Disconnect Switch
  • 2023
    permit on file, unconfirmedHeating & cooling: Two New Mini Split Units: Consists Of (7) Indoor And (2) Outdoor Units
  • 2023
    permit on file, unconfirmedElectrical: Two New Mini Split Units: Consists Of (7) Indoor And (2) Outdoor Units
  • 2023
    permit on fileRoof: Partial Reroof Sfr W/ Attached Garage Only (16 Sqs, Pitch 3:12): T/O (E) Shingles, C/O Plywood Sheating As Needed, Install Underlayment, Install Owens Corning Shingles (Crrc: 0890-0030, Aged Sri: 22, Color: Copper Trail - Brown) *See Attached Site Plan*
  • 2023
    permit on file, unconfirmedSolar: (6.00) Kw Dc Rated Pv Array (13.5)Kwh Rated Energy Storage System (15) Silfab Sil-400 Hc+ Solar Module (1) Tesla 1538000-Xx-Y 7.6Kw Integrated Inverter (1) Tesla Powerwall+ 1850000-Xx-Y (1) 200A Tesla Backup Gateway 2 (1) Tesla Powerwall+ (1) 125A Selected Load Center (1) Ess Disconnect Switch (1) M

Manage this home to schedule a service or to update the timeline.