LAHomework Sign in
La Puente, CA 91745 · Doverfield Ave

1008 Doverfield Ave

Built 1956 · 1,560 sq ft
LOT 6,174 SQ FT · 1 STRUCTURE · APN 8217-019-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,560 sqft
Lot size
6,174 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
8217-019-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 36 homes on Doverfield Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileSolar: Install Advanced Energy System Including: (2) Tesla Powerwall 2 Ac Batteries System (10Kw, 27 Kwh) (1) Tesla Backup Gateway 2Install New Internal Panel Board In Gw 2 To Hold New Ac Battery Circuit Breakers And Existing Photovoltaic System. Install New Sub Panel To Hold Existing Backup Loads. All Wor
  • 2024
    permit on fileGeneral remodel: Voluntary Seismic Retrofit Per La City Standard Plan #1, Detail 7. 1-Story Sfr (4' Max Cripple Wall)
  • 2022
    permit on fileElectrical: Electrical Service Upgrade To 100 Amps** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Electrical Equ
  • 2022
    permit on fileSolar: 4.290 Kw 13 Modules 13 Micro Inverters 1 Combiner Box

Manage this home to schedule a service or to update the timeline.