LAHomework Sign in
Beverly Hills, CA 90210 · N Rexford Dr

1005 N Rexford Dr

Built 1986 · 12,324 sq ft
LOT 30,653 SQ FT · 1 STRUCTURE · APN 4350-010-016Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1986
Living area
12,324 sqft
Lot size
30,653 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
10
Home type
Single-family
Parcel (APN)
4350-010-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 152 homes on N Rexford Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoof: Reroof Tear Off (E) Tile. Repair Block Paper, Put Back Same Tile
  • 2026
    permit on file, unconfirmedGeneral remodel: Waterproof Balcony (30' X 6') At Rear Of Sfr Per Esr-4587
  • 2025
    permit on file, unconfirmedRoof: Partially Tear Off Approx 15 Sq. At Middle Part Of The Flat Roof. Install New 3-Ply Torch Down Roof System. (E) Plywood Remains. Esr-2018
  • 2023
    permit on file, unconfirmedElectrical: Remodel (E) Master Bathroom On The Second Floor; New Sliding Door System In Master Bedroom
  • 2023
    permit on file, unconfirmedPlumbing: 2Nd Floor - Remodel (E) Master Bathroom
  • 2022
    permit on file, unconfirmedBathrooms: (E-Plan) Remodel (E) Master Bathroom On The Second Floor; New Sliding Door System In Master Bedroom

Manage this home to schedule a service or to update the timeline.