LAHomework Sign in
Glendale, CA 91208 · Calle Azul

1002 Calle Azul

Built 1992 · 4,120 sq ft
LOT 14,947 SQ FT · 1 STRUCTURE · APN 5663-029-014Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1992
Living area
4,120 sqft
Lot size
14,947 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
5663-029-014

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2022From build year 1992
HVACOn record 2013
Expected 2028 to 2033From the 2013 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 17 homes on Calle Azul →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2013
    permit on filePlumbing: 2 Low Pressure Gas System
  • 2013
    permit on fileHeating & cooling: 269 S.F. Shade Bar/Patio This Permit Includes Electrical. New Or Relocated Hvac Or Electrical Service Requires Separate Permits.
  • 2012
    permit on fileHeating & cooling: Bbq Includes Gas And Electrical For The Bbq New Or Relocated Hvac Or Electrical Service Requires Separate Permits.
  • 2012
    permit on filePool: 14 X 22 Pool Size, 10080 Gallons, Pool Heater Type 400000 Btu, D.E. Filter, Backway Yes. Includes Trades

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2022
  • 2028
    HVAC replacementExpected 2028 to 2033