LAHomework Sign in
W Hollywood, CA 90046 · N Spaulding Ave

1000 N Spaulding Ave

Built 1923 · 3,909 sq ft
LOT 6,426 SQ FT · 2 STRUCTURES · APN 5530-016-017Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
3,909 sqft
Lot size
6,426 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
5
Home type
Fourplex (4 units)
Parcel (APN)
5530-016-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1991
Usually done by 2021From the 1991 permit
HVACOn record 2015
Expected 2030 to 2035From the 2015 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 119 homes on N Spaulding Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileGeneral remodel: Soft Story Retrofit For Sheer Wall. Shall Be Painted And Stucco'Ed To Match Existing
  • 2019
    permit on fileGeneral remodel: Screening Report For Swof
  • 2015
    permit on fileHeating & cooling: Wall Heater
  • 2001
    permit on fileElectrical: Rec, Lights, Switches, Fixt, Res Appliance, 125 Am Notes Electrical Permit [Description]Rec, Lights, Switches, Fixt, Res Appliance, 125 Amproject Description: Rec, Lights, Switches, Fixt, Res Appliance, 125 Am
  • 2001
    permit on fileElectrical: 150 Amp Subpanel Notes Electrical Permit [Description]150 Amp Subpanelproject Description: 150 Amp Subpanel
  • 2000
    permit on fileHeating & cooling: Splits Systems, Inlets And Outlets Notes Mechanical Permit [Description]Splits Systems, Inlets And Outletsproject Description: Splits Systems, Inlets And Outlets
  • 2000
    permit on filePlumbing: Tub, Gas Sys, Lavatory, Shower, Toilet, Etc Notes Plumbing Permit [Description]Tub, Gas Sys, Lavatory, Shower, Toilet, Etcproject Description: Tub, Gas Sys, Lavatory, Shower, Toilet, Etc
  • 2000
    permit on fileGeneral remodel: Retrofit And Post Reinforcement Notes Building Permit [Description]Retrofit And Post Reinforcement [Inspection]Bldg-Loacation & Setbacks(Mjh-3/28/2000 9:55:44 Am) [Inspection]Bldg-Rated Wall Assemblies(Mjh-3/28/2000 9:55:49 Am) Approved By Jim Donovanproject Description: Retrofit And Post Reinforcem
  • 2000
    permit on fileElectrical: Add Plugs, Lites, Switches@ Accessory Bldgs Notes Electrical Permit [Description]Add Plugs, Lites, Switches@ Accessory Bldgsproject Description: Add Plugs, Lites, Switches@ Accessory Bldgs
  • 1999
    permit on fileRoom addition: Add 450 1St Floor And 1160 2Nd Floor Notes Building Permit [Description]Add 450 1St Floor And 1160 2Nd Floor [Inspection]Bldg-Loacation & Setbacks(Mjh-10/25/1999 10:32:52 Am) Approved By Liz Bar-El [Inspection]Bldg-Rated Wall Assemblies(Mjh-10/25/1999 10:33:03 Am) Approved By Seimone Jurjisproject D
  • 1999
    permit on fileGeneral remodel: Accessory Building And Storage Notes Building Permit [Description]Accessory Building And Storage [Inspection]Bldg-Loacation & Setbacks(Mjh-10/25/1999 10:39:50 Am) Approved By Liz Bar-El [Inspection]Bldg-Rated Wall Assemblies(Mjh-10/25/1999 10:40:07 Am) Approved By Seimone Jurjisproject Description:
  • 1991
    permit on fileRoof: Re-Roofing Notes Building Permit [Description]Re-Roofingproject Description: Re-Roofing

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2021
  • 2030
    HVAC replacementExpected 2030 to 2035