LAHomework Sign in
Glendale, CA 91202 · Crestview Ave

1000 Crestview Ave

Built 1936 · 2,408 sq ft
LOT 11,154 SQ FT · 2 STRUCTURES · APN 5630-005-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1936
Living area
2,408 sqft
Lot size
11,154 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5630-005-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Crestview Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: Solar Roof Mounted Pv Solar 8.8 Kw, 22 Panels, 13.5 Kwh Energy Storage System, 200A Load Center Revision To: Bsolar2209643. Updated Scope Of Work: Roof Mounted Pv Solar 8.8Kw, (22) Modules, 27Kwh Ess. 1 (N) 200A Internal Load Center, 1 (N) 225A Distribution Panel. What Changed: Equipment Location, P
  • 2022
    permit on fileElectrical: 1 200 Amp Service
  • 2020
    permit on fileGeneral remodel: Replace Stairway Location Demo (E) Stairs & Build (N) Stairs
  • 2020
    permit on fileRoof: Roof
  • 2019
    permit on filePool: Re-Plastering Pool And Add Jacuzzi
  • 2019
    permit on fileElectrical: 2- Outlets
  • 2019
    permit on filePlumbing: 1-Low Pressure Gas System
  • 2019
    permit on fileKitchen: Remodel (E) Kitchen, Remodel (E) Master Bath, Remodel (E) Bath And Closet, Replace Windows (4), Retrofit Sheer Wall. New Wood Sdl Windows In Three Openings Visible From Street; Existing Sills To Remain; One Window To Go In Opening With Sliding Door At Front Entry Area - Lower Portion Of Opening To B
  • 2019
    permit on fileBathrooms: Bathroom Remodel/Relocate Window With Trades (Planning:Window To Be Closed Is S/W Rear Coernr Of House -W-1 Will Be Located In Same Area Of House And Materials To Be Used Vinyl Silder Is Okay Per Jay P. No Effects On Front Or Vissible Area Of House From The Street Includes Trades

Manage this home to schedule a service or to update the timeline.