LAHomework Sign in
Altadena, CA 91001 · Marathon Rd

100 Marathon Rd

Built 1961 · 1,685 sq ft
LOT 7,063 SQ FT · 2 STRUCTURES · APN 5833-012-026Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1961
Living area
1,685 sqft
Lot size
7,063 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5833-012-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 58 homes on Marathon Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPlumbing: Sewer For An Eaton Fire Rebuild - 1-Story 1885 Sf Sfd (3 Beds, 2 Baths, 1 Powder Room) With 141 Sf Covered Porch And 400 Sf Attached Garage
  • 2026
    permit on file, unconfirmedElectrical: (1) 100Amp Temp Power Pole, 20Amp Circuit, 50Amp Circuit
  • 2026
    permit on file, unconfirmedPlumbing: Plumbing For An Eaton Fire Rebuild - 1-Story 1885 Sf Sfd (3 Beds, 2 Baths, 1 Powder Room) With 141 Sf Covered Porch And 400 Sf Attached Garage
  • 2026
    permit on file, unconfirmedElectrical: Electrical For An Eaton Fire Rebuild - 1-Story 1885 Sf Sfd (3 Beds, 2 Baths, 1 Powder Room) With 141 Sf Covered Porch And 400 Sf Attached Garage
  • 2026
    permit on file, unconfirmedHeating & cooling: Mechanical For An Eaton Fire Rebuild - 1-Story 1885 Sf Sfd (3 Beds, 2 Baths, 1 Powder Room) With 141 Sf Covered Porch And 400 Sf Attached Garage
  • 2023
    permit on fileGeneral remodel: Voluntary Seismic Upgrade Per La City Standard Detail #7 Only
  • 2020
    permit on fileKitchen: Kitchen Remodel: Kitchen Cabinets And Countertops Replacement. Conversion Of Closet Into Laundry Room. No Structural Changes.
  • 2020
    permit on filePlumbing: Install New Kitchen Sink, Dishwasher, And Relocate Laundry
  • 2020
    permit on file, unconfirmedElectrical: Kitchen Remodel And Laundry Relocation - New Circuit For Laundry, New Outlets, New Lights
  • 2020
    permit on fileHeating & cooling: Installation Of Hood Fan For Range

Manage this home to schedule a service or to update the timeline.